Skip to content
Laymac Ltd
Horsham · call direct
07862 069198
Laymac Ltd
Horsham · call direct
07862 069198 Get a quote

Dorset

Road planings in Blandford Forum

Recycled planings supplied and laid across DT11, a low-cost firm surface for tracks, gateways and yards.

On heavy Dorset clay, the gap between a mud track and a proper surfaced road is expensive to cross. Road planings are the middle ground, and for a lot of holdings around Blandford they are the most sensible money you can spend.

Gateways and field entrances

The single best use of planings on clay ground is gateways. A field entrance takes every vehicle that uses that field, turning and often waiting, on the wettest and most churned patch of the whole holding. A modest area of planings, laid at a decent depth and rolled, turns an entrance that is impassable in February into one that works all year, for very little outlay.

It is a small job with a disproportionate return, and it is one we are always happy to quote even though it is not a big ticket.

Tracks and yards

Planings also work well laid over a tired stone track, giving a firmer and cleaner surface without lifting anything, and for machinery standing and overflow parking where a full construction is not justified.

Clay needs a base first

This is the important caveat here and it is where planings get a bad name. Tipped straight onto soft wet clay, they will be pushed down into it and disappear within a season, and you will conclude planings do not work. On soft ground they need a stone base, or a membrane, or both, underneath them.

We will tell you honestly which your site needs. Sometimes it is planings straight onto a firm existing surface and it is cheap. Sometimes the ground has to be dealt with first and the job is bigger than you hoped. Being told that before the lorries arrive is worth more than a low quote.

Supply, or supply and lay

Plenty of farms here have a loader and would rather spread them themselves, and we are happy to deliver by the load. If you want it done, we grade the falls and roll it while it is workable, which is what makes it bind rather than stay loose.

  • A great deal cheaper than new tarmac
  • Reclaimed material, so it keeps a usable product in use
  • Binds into a firm surface when laid and rolled properly
  • Supply only, or supply and lay, whichever suits you
  • Can be laid over a tired stone track without lifting it

Our work

Jobs near Blandford Forum

Every photograph here is Laymac's own, taken on the job.

Before you ring

Road Planings in Blandford Forum: common questions

Will planings sink into our clay?

They will if they are tipped straight onto soft wet ground, which is why they sometimes get a poor reputation. On a firm base they are excellent. We will look at the ground and tell you whether it needs a stone base or a membrane underneath first.

Is it worth doing just a gateway?

Very much so. Gateways are the best value planings job there is: a small area, a big improvement, and it stops the churning that spreads out into the field. We are happy to quote small jobs like that.

How long do planings last on a farm track?

Well, if they are laid on something firm, rolled properly and the water is kept off them. They can be topped up rather than replaced, which is part of the appeal. Standing water is what shortens their life, as it is with everything else.

West Sussex · Surrey · East Sussex · Hampshire

Get a straight answer today

Give us a ring. If nobody picks up we are on a job, so leave a message and you will get a call back.

Call WhatsApp Quote