We lay road planings for suitable access tracks and working areas. Planings are recovered asphalt material from road maintenance. They can be an option for a practical surface, but the grading, condition and intended use need checking. Reclaimed material should be selected for a job, not accepted solely because it is inexpensive.
Assessing a planings installation
Existing tracks and hardstanding
We inspect the support beneath the surface, the route water takes and the vehicles using it. Ruts may indicate a drainage or bearing problem that another layer will not solve. Where the existing construction is reusable, preparation can include reshaping and local repairs before the specified material is laid.
Finished levels and compaction
The installation needs an agreed depth, profile and compaction approach. Those depend on the material and the supporting ground. The entrance, edges and any retained surfaces must work with the new levels. A load spread over an unprepared wet area is not an equivalent job.
What reclaimed asphalt can and cannot do
A compacted planings finish differs from freshly laid asphalt. Texture and performance vary with the source material, preparation and use. We do not promise that warm weather or passing vehicles will turn loose planings into a new tarmac road. For tight turning, intensive use or a refined domestic finish, another construction may be more appropriate.
Material checks before work
The source and classification matter. Some older asphalt can contain coal tar, and unsuitable or unclassified waste must not be treated as ordinary surfacing material. Any proposed material must be suitable and lawful for the particular use. We discuss the material specification as part of the installation scope.
Defining the quotation
- The area, access and preparation required.
- The proposed material and construction.
- Drainage, edge details and the intended finish.
- Any limitations and future maintenance to allow for.
This is an installation service for laying and compacting planings. Road milling and supply-only material sales are separate requirements and should not be assumed from this page.